WGIS, Eccles

September – December 2014

CLIENT NAME:

Geothermics Ltd

WGIS, Eccles

Part of a ground investigation to Install instrumentation for construction of link road and bridge over the Manchester Ship Canal beneath the M60 Barton Viaduct. Cable percussive drilling starting in 300mm and 250mm diameter to depths up to 50m and Rotary drilling from ground level casing off superfi- cial deposits to depths between 48 – 51m for Installation of extensometers and Inclinometers.